May 7, 2009
The pipe surface to be protected are cleared, free from scale, rust, oil, grease or the foreign matters to quality as specified in BS7079. Part O and A1, Swedish standard SIS 05-5900 or any applicable standard.
External protection
1. Priming: Pipes and specials are primed with a compatible priming coat in accordance with BS 4147 and BS [...]
Read the full article →
May 6, 2009
To ensure consistent product quality, advanced pipe testing and inspection facilities are a must to monitor every stage of production process. These tests include:
Ultrasonic pipe testing: Hot rolled coils are checked for correct thickness. All weldments, whenever specified will be inspected for flaw.
X-ray pipe testing: Weld seams at pipe ends and mitre welds [...]
Read the full article →